<form id="2jwqz"></form>

<tfoot id="2jwqz"></tfoot>
<menuitem id="2jwqz"><sup id="2jwqz"></sup></menuitem>
<tr id="2jwqz"></tr>
<cite id="2jwqz"><li id="2jwqz"></li></cite>
<style id="2jwqz"></style>
<sup id="2jwqz"><rt id="2jwqz"></rt></sup>
<cite id="2jwqz"><rp id="2jwqz"></rp></cite>

  • 国产高潮又爽又刺激的视频,国产高清在线不卡一区,久久伊人色,99蜜桃臀精品视频在线观看,免费无码日产av,狠狠躁夜夜躁人人爽天天古典 ,国产最新精品系列第三页,国产欧美日韩在线观看一区二区三区
    聯(lián)系電話

    13818755070

    技術(shù)文章/ Technical Articles

    我的位置:首頁  >  技術(shù)文章  >  出口式電子汽車衡安裝說明書(英文)

    出口式電子汽車衡安裝說明書(英文)

    更新時間:2015-03-09      瀏覽次數(shù):812

    出口式電子汽車衡安裝說明書(英文)

    出口式電子汽車衡

    采用當(dāng)今*的稱重傳感器和稱重顯示儀及各種外配設(shè)備而設(shè)計的全電子模塊化汽車稱重系統(tǒng)。稱重傳感器采用*技術(shù),能對溫度系數(shù)、非線性、滯后和蠕變等進行自動數(shù)字化補償;儀表功能豐富,存儲功能強;秤臺采用U形冷彎型鋼組焊而成,整體剛度、抗扭性能及臺面的局部剛度都有很大的改進;秤臺設(shè)計模塊化、標(biāo)準(zhǔn)化、系列化,可以自由組合成多種規(guī)格。整臺電子汽車衡系統(tǒng)環(huán)境適應(yīng)性強,加強配置后可實現(xiàn)全智能化及無人值守,并且計量性能*,準(zhǔn)確度高,長期穩(wěn)定性好,安裝調(diào)試維護方便。廣泛用于國外冶金、礦山、機械、化工、港口及公路貨站等行業(yè)。


    充分考慮了海運集裝箱運輸對汽車衡秤體尺寸的限制,同時又必須兼顧秤體的剛度要求和終端客戶現(xiàn)場的安裝便捷要求。據(jù)此公司自主開發(fā)了兩款出口結(jié)構(gòu)電子汽車衡,結(jié)構(gòu)合理,安裝快捷,風(fēng)靡海外市場。同時也可用于對超寬運輸有限制的國內(nèi)市場。

    附件為出口式電子汽車衡英文版安裝說明書。

    Simple installation steps  

    1. Check all goods against list, pay attention to the steel-seal letter A1A2A3A4A5A6A7  A8A9A10A11A12 on the surface of the scale-bodies, load cells, tools wooden cases and   indicator (See the following figure).Be ready to install   A2 A4 A6 A8 A10 A12   A1 A3 A5 A7 A9 A11 

    2. Scale-body assembling:   Lift the scale-bodies of corresponding marking with the 28mm shackle and assemble with a crane   (usually 15t), overturn and lie them flat(pad wood under the scale bodies to prevent the paint scaling   off), attention to the marking.the marking of A1A3 with the marking of A2A4 of the scale-body, the   marking of A5A7 with the marking of A6A8 of the scale-body , the marking of A9A11 with the   marking of A10A12 of the scale-body, then tighten the scale-bodies with 96 sets of M20X60   socket head cap bolts with M30 adjustable spanner,M20 socket head cap spanner and φ30x500mm   lever. Each pair of bolts including 2 washer, 1 spring washer and 1 thickening nut. See the following   figure:  

    3. Installing load cell  Tighten the M16X45 bolts with the lever. Each pair of bolts is including 1 washer and 1 spring  washer.    (Note: The marking on the load cell and scale-body should be consistent.)   Note:a. Install the load cell directly on the back of the markings A1A2A11A12 of the scale-bodies.   b. Install the load cell on connecting-plate of the scale-bodies markings A3A4A7A8 of the  scale-bodies.

    4. Place the scale-body into the completed pit 

    4.1 Fix up one end of the four steel cable in the same length into the installation hole on the  scale-body which marked A1A2A3A4 using the shackle, the other end of the steel cable should   cover with the crane. Ensure the scale-body in level when lifting. The degree of angle of the steel   cable should not less than 45°.   

    4.2 Lift the scale-body above the foundation slowly, put δ25~δ30mm thicken wood plate   between the scale-body and the walls of the foundation pit to guarantee the scale-body into center   place. Then put the load cell's steel ball and base-plate of ball-bowl on the foundation plate. Position   scale-body into the foundation .See the following figure:   Thicken Wood  

    4.3 Install the second-section scale-body which marked A5A6A7A8, ensure the marking   A5A6 of the second-section scale-body should be corresponding with the marking A3A4 of   the first-section scale-body. Place this scale-body into foundation pit slowly and attention to the   position of the joint. make sure the joint hole of joint should be corresponding with the connect   forelock of the first section scale-body. attention to adjusting the clearance about 56mm   between the two sections of scale-bodies. The clearance around the scale-body is roundly the   same. See the following figure:

    4.4 Lift and install the third-section scale-body(which marked A9A10A11A12)ensure the   marking A9A 10 of the third-section scale-body should be corresponding with the marking A7A8   of the second-section scale-body. The installation step the same as the first and second section   scale-body. 

    5. Adjust the scale-body after placing is finished.

    5.1. Check the eight steel-ball of load cell, If the steel-ball can be rotated, jack the scale-body up   in that position with the jack and put the level-adjusting plate under the installation plate for load cell   to make sure the steel-ball can't be rotated.   5.2. Adjust the M30x85 common limit bolts of the scale-body. (Rotate the bolt, it is better that there   is 5mm between the front-end of the bolt and the surface of scale-body, then rotate the nut.) In order   to avoid weighing accurate is not good from big rocking when the truck drives on the scale. 

    6. Pass out the signal cable from the passing-tube. Tie up the signal cable on the iron wire in the  passing-tube when passing. Then pull the iron wire to achieve the goal of passing. Next join the signal   cable to the junction box. (Attention to the marking on load cell and junction box should be consistent),   then fix up the junction box onto the two side-cover plates.) Then fixup the junction box on the side   cover-plate of the scale-body. 

    7. Fixup one end of the ground-cable onto the connecting-plate using M16 bolts, and fix up the other  end of the ground-cable onto ball-bowl base under-press using M12 bolts to let the load cell   short-connection, it will protects the load cell from damage by lightning when they are working.   ground-cable  

    8. Install the side-cover plate of the load cell: fixup the the cover-plate of load cell on the scale-body  with 24 sets of M10×25 stainless steel common bolts. attention to the marking on the side-cover plate   and the scale-body should be consistent.  

    9. Install the bracket: fixup the bracket on the side of the scale-body with the 36 sets of M16×35  common bolts(each pair including 1 washer, 1 spring washer, zinc-galvanizing treatment)  

    10. Pass out the signal cable from the PVC tube in foundation and join it into the pounds-room.

    11. The installation is finished.

    掃碼添加微信
    13816853446

    地址:上海市奉賢區(qū)奉浦大道97號綠地智尊A座1120-1123號

    服務(wù)熱線
    13816853446

    掃碼添加微信

    主站蜘蛛池模板: 麻豆人妻| 国产精品自在自线免费观看 | 综合一区无套内射中文字幕| 日本欧美大码a在线观看| 色偷偷av男人的天堂不卡| 性丰满freeolderwomanvideos| 欧美人成在线播放网站免费| 日本一区二区三本视频在线观看| 亚洲免费的福利片| 97久久超碰国产精品2021| 国产成人精品成人a在线观看| 依依成人影视国产精品| 亚洲中文在线观看av| 国产精品无码久久综合网| 欧美丰满熟妇bbbbbb百度| 日本一区二区视频在线播放| 大又大粗又爽又黄少妇毛片| 国产精品亚洲一区二区极品| 香蕉久久久久久av成人| 两个人的视频全免费观看在线| 精品一区二区av天堂| 99久久亚洲综合网精品| 国产一区二区三区在线电影| 中国少妇xxxx做受| 无遮挡男女激烈动态图| 91老肥熟女九色老女人| 亚洲乱亚洲乱少妇无码| 天天摸天天爽天天碰天天弄| 欧美成人精品三级在线观看| 国产精品自在在线午夜出白浆| 国产亚洲精品美女久久久久| 久久精品国产免费观看三人同眠| 青青青青久久精品国产av| 日韩丝袜人妻中文字幕 | 无码日韩精品91超碰| 亚洲成人动漫av在线| 久久综合色之久久综合色| 久久午夜无码鲁丝片直播午夜精品 | 国产亚洲精品国产福利在线观看| 激情文学人妻中文字幕| 久久精品99国产精品日本 |